The yellow house with the scaffolding is where the cable goes. No crane any more, but still need temp power.
The orange box with the various extension cords coming out of the bottom is the temp panel. I assume inside there is a 300mA RCD, a set of breakers and lots of Schuko and CEE 3ph sockets