zapped208
Thanks,
You are welcome to come see my set up anytime. I have thought about a generator but figured it would cost me allot more in the long run. I am not really sure how hard I am pushing the 200 amp service. I do not normally run everything all at once. Even when I do the motors are not under a very heavy load. The feed on my mill is not that fast and due to the accuracy of the band resaw we do not have to remove very much during planning and molding operations. If I were to get the scragg I would probably be running it by itself only one day a week. The scragg would have 5 times more production capability than the mill I am currently running. Do you know of any way to convert the 230v to 460v?
Hillbilly