Thanks for the informtion. In general, a second ground rod is required to be driven only if the first is found to to have a resistance to ground greater than 25 ohms. Who usually provides the resistance test, the electrical contractor or inspector? I'm aware a lot of times the second ground rod is driven just to be done with it and not be concerned with a resistance test.