Hello all,

I've brought this up before, but I don't think there was any real determination on the best way to bond a pool. BTW, I put it over here in the theory section because it's not really a code issue as it can be done either way.

The code just states that the pool and all equipment associated with it be bonded together. Connection of the bonding wire to the EGC of the Power source is optional. Which way would be better? And Why?

Bill


Bill