Ah, But I wasn't the fool!

At the far left of the first picture, you can see a door of the new service.

2 meters, 1-800A 120/208 for the sign, and a 200A for the building.

They're just releasing the sign.

I was kind of referring more to the relative sizes of the jobs (If you leave 1 wall standing and build from it, it's considered a remodel, & you save much$$ and time versus building a new building).

I was expecting more a 100' building with a 20' sign, rather than 20' of building with a 100' sign. [Linked Image]

Scott-you're right-405, and yes, I was counting streets 174, 173 etc until I looked up! Site was easy to find after that [Linked Image]