This IS the "before" pictures!!! Can't you tell that crack in the second picture needs to be caulked?

This is a very typical service in my neighborhood. The vertical conduit ran through a concrete pad. When the pad settled it pulled the conduit out of the meter socket. I did a service across the street last year that had done the same thing.

The distribution panel is a Federal Pacific. The electrical contractor saved where he could, as breakers were available at the time.

This was a pretty good job except the commute was a killer (90 seconds).

I was going to post some "after" pictures, but I'm not sure I want the vultures picking on my bones.

Dave