Quote

Found this service being done by city workers. Riser went through the roof into the attic, LB'ed into sch 40, proceeded halfway across the building (in attic) before LB'ing again outside to the meterbase and service equipment. A sch 40 then comes out of the panel to a trough for branch circuits. This has a 150A main and #2 THHN service conductors. Also has a #4 solid between meterbase and panel.

- necbuff
[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]