I was sent these photos by email, I have resized and lightened them, other than that I do not know to much.

This is not my work, but it did pass inspection. [Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

It appears one set of conductors passes through the meter to the panel.

It appears the line side for the meter passes through the bottom of the meter and into the panel turns up and back into the meter finally terminating at the line lugs.

The load side of the meter leaves the bottom of the meter wraps around the entire panel and back into the meter only to leave the the meter through the top hub.