They bond conduit that doesn't exist, and they nail-plate individual conductors that shouldn't be there to begin with, this all seems just a little bit backwards....
Ryan_J,
What do you mean by "bonding on the load side"?
-John
[This message has been edited by BigJohn (edited 03-28-2004).]