I have seen this method spec'ed in plans and specifications.
If I know that power and comm wiring are going to be in the same pole, I run nonmetallic greenfield from a j-box in the hand hole area to tthe lights.
The security guys can worry about signal loss or data corruption.
To get a pole with a divider is cost prohibitive on a bid job. Maybe as a change order once the contract is signed.


ed