[Linked Image]
Quote
THIS INSPECTION WAS INTERESTING AS THE CONTRACTOR WORKED VERY HARD TO CREATE A GOOD IMPRESSION AS THE INSTALLATION WAS NEAT AND WITH THE EXCEPTION OF THE GROUND DOWN CONNECTOR (I DON'T BELIEVE IT WAS ELECTRICAL) WAS TO CODE. IF IN FACT THE CONTRACTOR HAD INSTALLED An EQUIPMENT GROUNDING CONDUCTOR INTO THE DISTRIBUTION PANEL SOME CONSIDERATION MAY HAVE BEEN MADE BUT REGARDLESS 110.3B STILL IS QUITE VISIBLE AS THE CONNECTING MEANS WAS GROUND FLUSH WITH THE MAIN DISCONNECT.