Sounds like a foreclousre I worked on before.
The guy took the toilets, sinks, rock from the fire palce and the panel, left the incoming wire sticking through the wall. He did pull the wires from the breakers and not cut them out, so I was able to install new panel. The day I bid the job, checked incoming power and had none. The day I went to do the job, Power was on!!!! The owner wanted the power turned on monday, and the poco thought they would do a faver and turn on friday. I called the POCO for a disconnect, sent the guy that supervised the mowers, happened to be his weekend to be on call. He pulled the meter, and looked strange when I told him that was not going to work. The service had a CT meter and he had never seen one.