[Linked Image]

Here's an "After" Version. The Meterpan was moved torward the front of the house and the point of attachment changed. It's a 200A SE cable service w/sleeve above meter Schedule 80 PVC. Clamp on lower conduit not shown.


Bill

[This message has been edited by Bill Addiss (edited 08-31-2001).]


Bill