Center of the meter is about 30", the PoCo requires 36" to 72" if I'm not mistaken... I had put it at what I had assumed to be 60" above grade CL of meter.

I was mistaken in the original post, this is actually in Appalachian Electric Power's area, they don't require inspections, and the service was brought online as soon as there was a wall to hang it on way back when during the first rough-in stages. At the time it met the requirements.

[This message has been edited by sparky66wv (edited 07-16-2001).]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI