[Linked Image]

Quote
A 19.9KV Delta line is touching a guy wire after a cross beam broke. No arcing, no opening of the OCPD. All guys apear to be bonded to the GC.

I called in to the PoCo immediately, gave the the location and pole #. The guys terminated in a yard across the street, attached first to a telephone pole.

The lower lines are 4160/7200 WYE, and a 120/240V service triplex is visible.

Has it simply changed it to a corner grounded delta 19.9KV?

-Virgil