Photo's and info submitted by RODALCO:

Quote
With the contracting out of a lot of electrical work to third parties, the general standards seem to slip more, as the quotes are lower, and or (in)competency of people working on the network.
A lot of matters are re the simple wiring of contactors to control streetlighting and hotwater, The ommision of phase fuses in circuits or inadequate sized cables.
These photo's were taken from a distribution transformer TB 994, in Oteha Valley Rd, Albany, New Zealand.
Relay was replaced by persons unknown, no DIN rail in grey box, relay fallen out on to Neutral bar, 32 Amp HRC fuse desintergrated, was still live and fused via a 250 Amp DIN fuse.

[Linked Image]


[Linked Image]


{Thanks Ray}