I was told that when the boiler was installed, the electrics ran behind it and didn't reach, so they just pulled the socket from the wall and left it dangling beneath the boiler, and a nice hole in the wall (not in picture). It's been that way for months apparently, never a finished job.

This flat had white meter heating some time back (electric resistance heaters on a timer for nights with a dual meter), hence the extra commoning blocks. It's the service fuse that gets me, out of reach between the cupboard side and the wall.

Part P does not apply in Scotland. We have a part N instead, it says that major stuff needs tested and certificated but not minor. Not sure what that should be...


[This message has been edited by gideonr (edited 10-29-2005).]