Quote
Hi.

This is a new service that was installed in a house nearby that is being totally renovated. I noticed a few things right off the bat:

1. The temporary circuits, though temporary, were not terminated properly at the panel (through a knockout, etc.)

2. The neutral (with gray tape--I thought only white is permitted now?) and the GEC are terminated at the same bus bar.

3. There is not 30" of clearance to the left of the panel (that is necessary, correct?)

What else (if anything) catches your eye?

- thinkgood