Ryan_J

Quote
Instead of calling the electrician on the phone, why don't you place a call to the local liscening board and go after this guy?

I really thought about this question, you are right, that is probably the thing I should have done.

Any reasons I came up with in my head for not doing that are more correctly described as excuses.

I would think that both this work was done without permits and over a long time, perfect conditions for anyone to deny any involvement.

The up side is all that the only equipment not in the trash when I left was the 12 circuit plug in panel, all original branch circuits where cut back about 10' from the service so the Demo contractor can start his work from there.

This space is getting gutted to the exterior walls, the basement slab is getting ripped up to do cleaning chemical abatement. Any rework of this space will surly be inspected and brought to code.

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts