Someone found this problem at a newly constructed site. The water was actually boiling when the site lites were energized.
The electrical contractor installed a nonmetallic junction box below grade, and then fabricated a 4 inch square cover to it to allow a riser conduit for the support and to feed a sign lite.
[This message has been edited by Joe Tedesco (edited 02-18-2003).]