A projector is mounted from the suspended ceiling in a retail store. It is mounted to a 1-1/2 PVC pipe which is secured to the building at a point above the ceiling grid. The PVC has grommeted holes below the grid and above to pass wires thru. The power cord is passed thru the pipe into the area above the grid, where it is plugged into a duplex mounted above the ceiling. The area above the grid is not used for an air plenum. Would this installation meet code?