ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 270 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Gallery
Next Gallery
Print Thread
Rating: 1
#204390 12/06/11 02:38 PM
Photo10261113.jpg
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
PVC Anyone?

One of the PVC areas at a new data center.
9 Comments
HotLine1 #204457 12/10/11 04:59 PM
Joined: Feb 2003
Posts: 368
M
Member
looks like there a couple of bends that are going to be real tight to pull through.

HotLine1 #204464 12/10/11 11:23 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
mb:

They modified four 3/4" runs after this pic was taken, and before the slurry pour. The 3/4" & 1" are for data and control circuitry; most of the small PVC will have single circuit or data or control cable only.

I'm trying to get an OK to take pics of the 4" RGC/IMC work inside the building.


John
HotLine1 #204465 12/11/11 12:12 AM
Joined: Jan 2008
Posts: 2
P
New Member
what a mess. I would not of showed that to anyone.

HotLine1 #204485 12/14/11 12:58 AM
Joined: Sep 2006
Posts: 155
C
Member
I've seen worse, and sometimes you dont have time to make it pretty in the trench....even though after the rush is over it sits open for days.....

HotLine1 #204503 12/15/11 10:37 AM
Joined: Mar 2004
Posts: 947
T
twh Offline
Member
The rush is over for the trench to the right. It's already filled. That's a real hard way to run pipe.

HotLine1 #204507 12/15/11 03:19 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
This was done in 3 stages. Stub-ups at the gen pad locations (8) Cat gens, 13.2KV, 2.5 MW each. Two (2) chiller feeders and control. The tough part is what's in the pic...getting thru the foundation.footings to the interior. Tight squeeze.

After the slurry pour, tape, clean backfill, there's a 10" concrete pad over it. (Not counting the gen pads @ 14" above)



John
HotLine1 #209226 03/16/13 11:05 PM
Joined: Feb 2004
Posts: 1,438
Member
Is there a reason they couldnt sweep those vs. the hard 90's?

HotLine1 #209227 03/17/13 01:55 AM
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
RNC was too big to fit in the tail pipe of the truck? smile

HotLine1 #209228 03/17/13 01:21 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Lost:
This was a three stage part of a project, started at three locations. What is in the pic is best described as the 'convergence' point. Thru the foundation and connecting into the slab work in the building.

Surprise was, it all worked out!!


John